By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Hindustan PioneerHindustan Pioneer
  • Home
  • Business
  • News
  • Education
  • Entertainment
  • Lifestyle
  • Travel
  • Web Stories
Reading: Arunachal Pradesh: 69 Former Bureaucrats Urge Centre to Scrap 1,750-MW Demwe Lower Hydropower Project
Share
Notification Show More
Latest News
Assam Enters Defence Manufacturing With New Advanced Technology Facility in Rangia
November 25, 2026
Arunachal Pradesh: 69 Former Bureaucrats Urge Centre to Scrap 1,750-MW Demwe Lower Hydropower Project
November 25, 2026
Nagaland-Set Film Angh and Marathi Film Gondhal Enter 99th Oscars International Feature Film Race
November 25, 2026
Manipur Government Pushes for UNESCO Heritage Status for Kangla Fort, Calls for Cultural Preservation
November 25, 2026
Assam CM Himanta Biswa Sarma Distributes ₹5 Lakh Compensation to Kaziranga Accident Victims’ Families
November 25, 2026
Aa
Aa
Hindustan PioneerHindustan Pioneer
  • Home
  • Business
  • News
  • Education
  • Entertainment
  • Lifestyle
  • Travel
  • Web Stories
Follow US
  • Advertise
  • Editorial Policy
  • Contact Us
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Home » Blog » Arunachal Pradesh: 69 Former Bureaucrats Urge Centre to Scrap 1,750-MW Demwe Lower Hydropower Project
News

Arunachal Pradesh: 69 Former Bureaucrats Urge Centre to Scrap 1,750-MW Demwe Lower Hydropower Project

Boyar Debbarma
By Boyar Debbarma Published November 25, 2026 8 Min Read
Share
SHARE

A group of 69 former bureaucrats has urged the Union Environment Ministry to cancel the proposed 1,750-MW Demwe Lower Hydroelectric Project on the Lohit River in Arunachal Pradesh. In a letter dated November 23, the signatories raised concerns about large-scale forest loss, threats to endangered wildlife and the impact on indigenous communities.

Contents
Key Facts About the Demwe Lower Hydroelectric Project69 Former Bureaucrats Demand Cancellation of Hydropower ProjectProject Faces Long-Standing Opposition From Tribal CommunitiesNational Green Tribunal Suspended Project Approvals in 2017Environmental Concerns Over Endangered WildlifeGreenko Group Acquired the Project in 2026Former Bureaucrats Question China’s Water Diversion ArgumentQuestions and AnswersImportance of Arunachal Pradesh’s Lohit River Ecosystem

They warned that the project could damage ecologically sensitive rainforests and disrupt important wildlife corridors. The group also questioned the project’s environmental clearances and the scientific assessments supporting its approval. They have called for the project to be scrapped to protect the region’s biodiversity, river system and local communities.

Read More: Nagaland Film Angh and Gondhal Enter 99th Oscars Race

Key Facts About the Demwe Lower Hydroelectric Project

  • Project: Demwe Lower Hydroelectric Project
  • Location: Lohit River, Arunachal Pradesh
  • Proposed capacity: 1,750 MW
  • Forest diversion: 1,416 hectares
  • Land submergence: Approximately 1,590 hectares
  • Estimated tree loss: Around 43,000 trees
  • Opposition: 69 former bureaucrats
  • Letter date: November 23, 2026
  • New project owner: Greenko Group
  • Major concerns: Biodiversity loss, forest destruction and impact on indigenous communities

69 Former Bureaucrats Demand Cancellation of Hydropower Project

The former bureaucrats addressed their letter to the Union Environment Ministry, the Arunachal Pradesh Chief Minister and the Standing Committee of the National Board for Wildlife (SC-NBWL).

Among the signatories are former Delhi Lieutenant Governor Najeeb Jung and former Principal Chief Conservator of Forests of Kerala Prakriti Srivastava, along with 67 others.

They alleged that successive governments had continued pursuing the project since 2011 despite concerns about its environmental and social consequences.

According to the letter, the proposed dam would require the diversion of 1,416 hectares of forest land, submerge approximately 1,590 hectares and result in the removal of around 43,000 trees.

The signatories warned that such extensive construction could cause serious damage to Arunachal Pradesh’s sensitive evergreen rainforest ecosystem.

Project Faces Long-Standing Opposition From Tribal Communities

The Demwe Lower Hydroelectric Project has faced opposition from local communities and environmental groups for several years.

Resistance reportedly began after the project received its initial environmental clearance in 2010. Mishmi and other tribal communities, indigenous organisations and environmentalists raised concerns about its impact on sacred Parashuram Kund and downstream ecosystems.

The former bureaucrats also highlighted the wildlife panel’s earlier objections.

In October 2011, all non-official expert members of the SC-NBWL reportedly rejected the project because of potential threats to endangered wildlife downstream.

However, the project received wildlife clearance in 2012 under the then Union Environment Minister, despite those objections, the letter alleged.

National Green Tribunal Suspended Project Approvals in 2017

The project’s environmental approvals later faced a legal challenge before the National Green Tribunal (NGT).

In 2017, the tribunal suspended the approvals after finding that the former environment minister had unlawfully overridden the unanimous objections of independent expert members, according to the signatories.

The NGT directed the wildlife panel to reconsider the proposal. It also suspended the Stage-I and Stage-II forest clearances and called for proper examination of ecological concerns, particularly the cumulative impact on downstream areas.

However, the former bureaucrats alleged that the reconstituted SC-NBWL approved the project again in 2018 without conducting the multi-seasonal assessment directed by the tribunal.

They also questioned the adequacy of the Wildlife Institute of India’s report used during the assessment.

Environmental Concerns Over Endangered Wildlife

The signatories warned that the proposed hydropower project could threaten several sensitive wildlife habitats.

One major concern involves the critically endangered white-bellied heron, a rare bird that depends on healthy river ecosystems.

They also raised concerns about possible damage to the wider ecological landscape connecting Kamlang and Namdapha, along with the proposed Dibang Tiger Reserve.

According to the letter, forest fragmentation could disrupt wildlife movement, including important tiger corridors.

The former bureaucrats argued that these ecological risks require updated scientific assessments before authorities consider further approvals.

Greenko Group Acquired the Project in 2026

The project did not move forward in 2018 because of financial difficulties faced by its project proponent and other factors.

In 2026, the Greenko Group acquired the project.

The signatories questioned the SC-NBWL’s consideration of the ownership change in July 2026. They alleged that the committee did not conduct a comprehensive fresh wildlife assessment or rely on updated scientific information.

Instead, they claimed that authorities relied on an outdated rapid assessment conducted in 2018.

The group argued that such an approach does not adequately address the project’s current environmental risks.

Former Bureaucrats Question China’s Water Diversion Argument

The letter also challenged the argument that the Demwe Lower project could help India establish prior appropriation rights over Brahmaputra waters and counter China’s upstream dam-building activities.

The signatories argued that, without a bilateral water-sharing treaty, constructing downstream infrastructure cannot prevent an upstream country from diverting river water.

They also pointed out that an estimated 70–80 per cent of the Brahmaputra system’s total water volume in India originates within Arunachal Pradesh and Assam, largely through monsoon rainfall and snowmelt.

Therefore, they questioned whether the proposed dam could achieve the strategic water-security benefits claimed by its supporters.

Questions and Answers

1. What is the Demwe Lower Hydroelectric Project?

It is a proposed 1,750-MW hydropower project on the Lohit River in Arunachal Pradesh.

2. Why are 69 former bureaucrats opposing the project?

They cite forest destruction, biodiversity loss, threats to endangered wildlife and risks to indigenous communities.

3. How much forest land would the project require?

The project would require the diversion of approximately 1,416 hectares of forest land.

4. Which endangered species could face threats?

The critically endangered white-bellied heron is among the species identified in the letter.

5. Which company acquired the project in 2026?

The Greenko Group acquired the project in 2026.

6. What are the former bureaucrats demanding?

They want the Union Environment Ministry and relevant authorities to scrap the project.

Importance of Arunachal Pradesh’s Lohit River Ecosystem

Arunachal Pradesh forms an important part of Northeast India’s ecological landscape. Its forests, rivers and wildlife habitats support rich biodiversity and sustain numerous indigenous communities.

The debate over the Demwe Lower Hydroelectric Project highlights the challenge of balancing hydropower development with environmental protection. The former bureaucrats have urged authorities to prioritise ecological sustainability and the long-term interests of communities dependent on the Lohit River system.

Also Read: Sikkim Wins SVANidhi Samman Award 2026 – Prime 24 Seven

You Might Also Like

Assam Enters Defence Manufacturing With New Advanced Technology Facility in Rangia

Nagaland-Set Film Angh and Marathi Film Gondhal Enter 99th Oscars International Feature Film Race

Manipur Government Pushes for UNESCO Heritage Status for Kangla Fort, Calls for Cultural Preservation

Assam CM Himanta Biswa Sarma Distributes ₹5 Lakh Compensation to Kaziranga Accident Victims’ Families

Assam Elephant Calf Raja Airlifted to Gujarat for Advanced Medical Treatment

TAGGED: Arunachal environmental news, Arunachal Pradesh hydropower project, Demwe Lower Hydroelectric Project, Greenko Group, Lohit River dam
Boyar Debbarma November 25, 2026
Share this Article
Facebook Twitter Whatsapp Whatsapp LinkedIn Copy Link
Posted by Boyar Debbarma
Driven to transform ideas into compelling stories, with a strong focus on creative writing.
Previous Article Nagaland-Set Film Angh and Marathi Film Gondhal Enter 99th Oscars International Feature Film Race
Next Article Assam Enters Defence Manufacturing With New Advanced Technology Facility in Rangia
Leave a comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

- Advertisement -

Latest News

Assam Enters Defence Manufacturing With New Advanced Technology Facility in Rangia
News
Arunachal Pradesh: 69 Former Bureaucrats Urge Centre to Scrap 1,750-MW Demwe Lower Hydropower Project
News
Nagaland-Set Film Angh and Marathi Film Gondhal Enter 99th Oscars International Feature Film Race
News
Manipur Government Pushes for UNESCO Heritage Status for Kangla Fort, Calls for Cultural Preservation
News

© 2022-2026 Hindustan Pioneer. All Rights Reserved.

  • About Us
  • Editorial Policy
  • Our Team
  • Contact Us

Removed from reading list

Undo
Welcome Back!

Sign in to your account

Lost your password?