By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Hindustan PioneerHindustan Pioneer
  • Home
  • Business
  • News
  • Education
  • Entertainment
  • Lifestyle
  • Travel
  • Web Stories
Reading: Subansiri Dam Project Hits By Landslide
Share
Notification Show More
Latest News
Shutdown Imposed in Parts of Kangpokpi After Arson Attack on K. Songlung Village
January 27, 2026
Mizoram CM Lalduhoma Launches ‘Mizoram CSR Connect’ Portal to Boost CSR Investments
January 27, 2026
Assam CM Himanta Biswa Sarma Highlights Investment Opportunities at WEF 2026
January 22, 2026
Muanpuii Saiawi Appointed India’s Next High Commissioner to New Zealand
January 22, 2026
Golden Competitions 2026 Conclude Successfully at Maghey Sankranti Mela in Sikkim
January 21, 2026
Aa
Aa
Hindustan PioneerHindustan Pioneer
  • Home
  • Business
  • News
  • Education
  • Entertainment
  • Lifestyle
  • Travel
  • Web Stories
Follow US
  • Advertise
  • Editorial Policy
  • Contact Us
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Home » Blog » Subansiri Dam Project Hits By Landslide
News

Subansiri Dam Project Hits By Landslide

Reporter
By Reporter 2 Min Read Published April 5, 2023
Share
Subansiri Dam Project
SHARE

The Subansiri Lower Dam project, which has been a source of controversy due to its location on the Assam-Arunachal border, was impacted by a landslide caused by pre-monsoon rains in the region on Monday

The National Hydro-Electric Power Corporation (NHPC) claims that the project will still be operational by June this year despite the setback.

As parts of Northeast India experienced pre-monsoon rain and hailstorms, locals captured videos of soil and boulders tumbling down a hillside that has been excavated for construction beside the Subansiri Lower Hydroelectric Project at Gerukamukh in Assam’s Dhemaji district.

The executive director of the project, Vipin Gupta, stated that the landslide did not harm the project. “There was some overhang that we were planning to remove by blasts. That portion has fallen off by itself because of the rainfall,” he explained.

The NHPC has informed the district administration that there is no need to panic, according to an official. “They said the project will not be affected in any manner. We will be doing a check on the ground to verify this and see if there are any measures to be taken,” said the official.

Despite the harsh weather conditions before the onset of monsoon this year, Gupta said that the NHPC is “on target” to begin operations in two units of the dam.

You Might Also Like

Shutdown Imposed in Parts of Kangpokpi After Arson Attack on K. Songlung Village

Mizoram CM Lalduhoma Launches ‘Mizoram CSR Connect’ Portal to Boost CSR Investments

Assam CM Himanta Biswa Sarma Highlights Investment Opportunities at WEF 2026

Muanpuii Saiawi Appointed India’s Next High Commissioner to New Zealand

Golden Competitions 2026 Conclude Successfully at Maghey Sankranti Mela in Sikkim

TAGGED: Arunachal border, Assam, Hindustan Pioneer, Hindustanpioneer, Subansiri Dam Project
Reporter April 5, 2023
Share this Article
Facebook Twitter Whatsapp Whatsapp LinkedIn Copy Link
Previous Article Speed Violations in Mumbai Monthly Speed Violations Reach 8,000 In Mumbai
Next Article NDPS Act Himachal Pradesh Assembly Passes Resolution To Strengthen NDPS Act
Leave a comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

- Advertisement -

Latest News

Shutdown Imposed in Parts of Kangpokpi After Arson Attack on K. Songlung Village
News
Mizoram CM Lalduhoma Launches ‘Mizoram CSR Connect’ Portal to Boost CSR Investments
News
Assam CM Himanta Biswa Sarma Highlights Investment Opportunities at WEF 2026
News
Muanpuii Saiawi Appointed India’s Next High Commissioner to New Zealand
News

© 2022-2025 Hindustan Pioneer. All Rights Reserved.

  • About Us
  • Editorial Policy
  • Our Team
  • Contact Us

Removed from reading list

Undo
Welcome Back!

Sign in to your account

Lost your password?