The Cabinet Committee on Economic Affairs has approved a ₹2,014 crore Greenfield Airport at Doloo in Silchar’s Cachar district, Assam. The proposed airport will feature a terminal with a peak-hour capacity of 800 passengers and is expected to improve air connectivity across the Barak Valley and neighbouring regions.
President Murmu to Attend Hornbill Festival
Cabinet Approves New Greenfield Airport at Doloo
Assam is set to receive a major aviation infrastructure project after the Cabinet Committee on Economic Affairs (CCEA) approved the development of a new Greenfield Airport at Doloo near Silchar. The project, estimated to cost ₹2,014 crore, will be developed by the Airports Authority of India (AAI).
The Union Cabinet’s approval, announced on November 25, 2026, marks an important step towards expanding aviation infrastructure in southern Assam. Located in Cachar district, Doloo occupies a strategic position in the Barak Valley, which has significant economic, agricultural and tourism potential.
The proposed airport aims to address the operational and space constraints of the existing Silchar Airport while accommodating growing passenger demand. It is also expected to strengthen connectivity between the Barak Valley, other parts of Northeast India and wider national and international transport networks.
Airport to Handle 800 Passengers During Peak Hours
One of the key features of the proposed Doloo Greenfield Airport will be its passenger terminal. According to the government’s announcement, the terminal building will cover an area of approximately 12,351 square metres.
It will have the capacity to handle 800 passengers during peak hours, including arriving and departing travellers. This capacity is designed to support increasing air traffic and provide additional room for passenger movement.
The terminal will also incorporate modern passenger facilities and sustainable green-building principles. Its modular design will allow for future expansion as passenger demand grows.
The airport is expected to handle approximately 1.01 million passengers annually, according to the government’s project details.
New Runway Designed for A-320 Aircraft
The airport project includes a new runway measuring 2,705 metres in length and 45 metres in width. The runway will meet Code 4C standards and accommodate Airbus A-320 aircraft.
This runway will play a key role in supporting commercial passenger flights. In addition, the development plan includes an aircraft parking apron with space for six A-320 aircraft. The airport will also feature a dedicated isolation bay.
Together, these facilities will provide essential infrastructure for regular airport operations. Moreover, they will help the region address its growing aviation needs.
Why Silchar Needs a New Airport
The existing Silchar Airport operates as a civil enclave on defence land. As a result, this arrangement creates operational and spatial limitations. It also makes further infrastructure expansion difficult.
According to the Ministry of Civil Aviation, the proposed airport at Doloo will address these challenges. Furthermore, it will provide additional capacity to meet sustained passenger growth.
The new facility will also allow the region to develop aviation infrastructure according to future needs. For instance, its larger terminal and dedicated aircraft facilities will help manage increased passenger movement. These features will also improve airport operations.
Therefore, the project holds significance for both Silchar and the wider southern Assam region.
Boost to Barak Valley Connectivity
The Barak Valley plays an important role in southern Assam. The region has established tea gardens, active agricultural sectors and considerable potential for eco-tourism and cultural tourism.
Improved air connectivity could make the valley more accessible to business travellers and tourists. It could also benefit people travelling for personal and professional reasons.
Furthermore, the proposed airport aims to serve South Assam and adjoining areas of neighbouring states. Consequently, residents who currently depend on existing transport networks could gain more convenient travel options.
Better aviation facilities could also strengthen connections between the Barak Valley and major destinations across India.
Opportunities for Trade, Tourism and Regional Development
The new airport could support economic activity by improving access to the Barak Valley. In particular, tourism stands to benefit from better connectivity.
Easier air access may encourage more visitors to explore the region’s natural landscapes, tea gardens and cultural attractions. Meanwhile, improved infrastructure could support business travel and attract investment in local industries.
Agriculture and horticulture could also gain from stronger logistics connections. The government’s project information highlights the airport’s potential to support cargo movement. This includes transporting perishable and horticultural products from the Northeast.
As a result, regional producers could gain better access to wider markets. However, the actual benefits will depend on the airport’s operations and the availability of cargo services.
Airports Authority of India to Develop the Project
The Airports Authority of India will undertake the development of the new Greenfield Airport at Doloo.
The project carries an estimated cost of ₹2,014 crore. Its approval marks an important step towards expanding aviation infrastructure in Cachar district. Moreover, the airport could improve connectivity across southern Assam.
However, the Cabinet announcement does not mention a construction completion date. It also does not specify when commercial flight operations will begin. The government may provide these details as the project advances through its implementation stages.
Conclusion
The Cabinet Committee on Economic Affairs has approved a ₹2,014 crore Greenfield Airport at Doloo in Silchar, Assam. The project includes a terminal with peak-hour capacity for 800 passengers, a 2,705-metre runway and parking facilities for six A-320 aircraft.
Together, these features will expand aviation infrastructure in the Barak Valley. The new airport could also address the limitations of the existing Silchar Airport. Furthermore, it has the potential to support regional connectivity, tourism, trade and economic development.
Residents and businesses across South Assam and neighbouring areas will closely follow the project’s progress.
Frequently Asked Questions (FAQs)
1. Where will the new Greenfield Airport in Assam be built?
The Airports Authority of India will develop the proposed airport at Doloo in Silchar, Cachar district, Assam.
2. What is the estimated cost of the Doloo Greenfield Airport project?
The project carries an estimated cost of ₹2,014 crore.
3. Who approved the new airport project?
The Cabinet Committee on Economic Affairs (CCEA) approved the project on November 25, 2026.
4. What will be the peak-hour passenger capacity of the airport?
The proposed terminal will handle up to 800 passengers during peak hours.
5. What are the main technical features of the new airport?
The project includes a 12,351-square-metre terminal and a 2,705-metre-long, 45-metre-wide Code 4C runway. It will also feature an apron for six A-320 aircraft and a dedicated isolation bay.
6. How will the new airport benefit the Barak Valley?
The airport could improve air connectivity, support tourism and trade, and provide better access to South Assam and adjoining regions.
7. When will the Doloo Greenfield Airport become operational?
The Cabinet approval announcement does not specify a construction completion date or the expected start of commercial flight operations.
