By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Hindustan PioneerHindustan Pioneer
  • Home
  • Business
  • News
  • Education
  • Entertainment
  • Lifestyle
  • Travel
  • Web Stories
Reading: Uttarakhand Tunnel Collapse: Rescue Efforts Stalled as Hurdles Persist
Share
Notification Show More
Latest News
Assam Elephant Calf Raja Airlifted to Gujarat for Advanced Medical Treatment
November 21, 2026
Sikkim: BJP ST Morcha Seeks Centre’s Intervention on Three Tribal Demands
November 21, 2026
Manipur Cherry Blossom cum Flower Festival 2026 Begins at Mao Gate in Senapati
November 21, 2026
Amit Shah
Arunachal Pradesh: Adi Ba Kebang United Opposes 11,200-MW Siang Upper Dam, Raises Indigenous Rights Concerns
November 21, 2026
Nagaon: Man Accused of Marrying Six Women Using Fake Identities Arrested
November 21, 2026
Aa
Aa
Hindustan PioneerHindustan Pioneer
  • Home
  • Business
  • News
  • Education
  • Entertainment
  • Lifestyle
  • Travel
  • Web Stories
Follow US
  • Advertise
  • Editorial Policy
  • Contact Us
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Home » Blog » Uttarakhand Tunnel Collapse: Rescue Efforts Stalled as Hurdles Persist
Misc

Uttarakhand Tunnel Collapse: Rescue Efforts Stalled as Hurdles Persist

Reporter
By Reporter Published November 18, 2023 2 Min Read
Share
SHARE

The rescue operation to save 41 workers trapped inside the collapsed Silkyara Tunnel in Uttarkashi, Uttarakhand, hit another hurdle on day 6 of the ordeal. A high-capacity drilling machine that was being used to create a rescue tunnel stalled after drilling around 22 meters.

The machine is believed to have stalled due to the presence of hard debris in the tunnel. Rescue workers are trying to clear the debris and get the machine working again.

The rescue operation has been hampered by a number of challenges, including the instability of the tunnel, the presence of water, and the lack of ventilation. Despite these challenges, rescue workers are continuing to work tirelessly to save the trapped workers.

Here is a timeline of events:

  • Day 1: On November 12, 2023, a section of the under-construction 2.5-km Silkyara tunnel in Uttarkashi collapsed, trapping 41 workers.
  • Day 2: Rescue workers began drilling a rescue tunnel to reach the trapped workers.
  • Day 3: Rescue workers encountered hard debris in the tunnel, which slowed down the drilling process.
  • Day 4: Rescue workers continued to drill through the hard debris.
  • Day 5: Rescue workers reached a depth of around 22 meters in the rescue tunnel.
  • Day 6: The high-capacity drilling machine stalled due to the presence of hard debris.

Rescue workers are hoping to resume drilling as soon as possible. They are also preparing for a possible contingency plan, which could involve using a different drilling method or creating a new rescue tunnel.

The families of the trapped workers are anxiously awaiting news of their loved ones. They are praying for a miracle and hoping that the rescue workers will be able to save them.

The Uttarakhand tunnel collapse is a tragedy. It is a reminder of the dangers of construction work and the importance of safety. Our thoughts and prayers are with the trapped workers and their families.

You Might Also Like

Agartala Deploys Solar-Powered Smart Streetlights

Operation Jericho Now Strengthens Mizoram Drug Crackdown

Assam Crop Diversification Gets Powerful Push from Hazarika Now

Rinika Bharali: Now, Imphal mourns Guwahati shooting victim

Siang project review: Arunachal CM seeks clear answers now

Reporter November 18, 2023
Share this Article
Facebook Twitter Whatsapp Whatsapp LinkedIn Copy Link
Previous Article Royce Holidays: Unwrap Your Next Adventure with Our Holiday Travel Experiences
Next Article How to Watch Serbia v England MU21s Live: A Comprehensive Guide
Leave a comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

- Advertisement -

Latest News

Assam Elephant Calf Raja Airlifted to Gujarat for Advanced Medical Treatment
News
Sikkim: BJP ST Morcha Seeks Centre’s Intervention on Three Tribal Demands
News
Manipur Cherry Blossom cum Flower Festival 2026 Begins at Mao Gate in Senapati
News
Amit Shah
Arunachal Pradesh: Adi Ba Kebang United Opposes 11,200-MW Siang Upper Dam, Raises Indigenous Rights Concerns
News

© 2022-2026 Hindustan Pioneer. All Rights Reserved.

  • About Us
  • Editorial Policy
  • Our Team
  • Contact Us

Removed from reading list

Undo
Welcome Back!

Sign in to your account

Lost your password?